Brivibas 183k1 – an entire floor has been added

In this project, we built an entire floor in a 5-storey apartment building.доме.

In this project, we built an entire floor in a 5-storey apartment building.доме.

The project consisted of 4 two-storey flats – 3 flats are three-bedroom and 1 four-bedroom.

  • A gas boiler has been installed in the flats
  • Wear-resistant, environmentally friendly, energy-efficient materials have been used